Filing - Arizona Public Service Company's Response to Petition for Review
ATTACHMENTS
- Attachment 1 - 2019 Permit
- Attachment 2 - 2019 Fact Sheet
- Attachment 3 - 2019 Response to Comments
- Attachment 4 - 2015 Biological Opinion
- Attachment 5 - 1983 Permit
- Attachment 6 - 25 - EPA Region IX Inspection Report (10/4/2007)
- Attachment 7 - Permit Renewal Letter (10/5/2005)
- Attachment 8 - Permit Renewal Letter (2/15/2013)
- Attachment 9 - 2017 Sheth Memo
- Attachment 10 - Project Summary (4/4/2019)
- Attachment 11 - Draft 2019 Permit
- Attachment 12 - Draft 2019 Fact Sheet
- Attachment 13 - EPA Corps Rapanos Guidance (12/2/2008)
- Attachment 14 - InsideEPA Article (9/18/2013)
- Attachment 15 - EPA CWA 401 Water Quality Certification Document (2010)
- Attachment 16 - 2006 TAS Decision Document
- Attachment 17 - Navajo Nation Clarification Letter (10.31.2005)
- Attachment 18 - Perciasepe Memo (12/13/1993)
- Attachment 19 - 2018 Response to Comments
Link to Filing (PDF. pages)
EAB Appeal Number(s): NPDES 19-06
Filing Number: 8
Filing Date: 12/18/2019
Case Name: Arizona Public Service
The documents provided by the Board are Adobe Acrobat PDF ( Portable Document Format). They can be viewed, and printed, with the use of an Adobe Acrobat Reader. The Adobe Acrobat Reader is available, free, for Unix, Macintosh, IBM DOS, and IBM Windows operating systems. Download the latest version of Adobe Acrobat Reader
![exit EPA](https://www3.epa.gov/epafiles/images/epafiles_misc_exitepadisc.gif)
![exit EPA](https://www3.epa.gov/epafiles/images/epafiles_misc_exitepadisc.gif)